MCQs 1: The reduction in project time normally results in_______________?

MCQs 2: The process of incorporating changes and rescheduling or replanning is called_______________?

MCQs 3: The normal time required for the completion of project in the above problem is_______________?

MCQs 4: Updating may result in_________________?

MCQs 5: Interfering float is the difference between__________________?

MCQs 6: A tractor whose weight is 20 tonnes has a drawbar pull of 2500 kg, when operated on a level road having a rolling resistence of 30 kg per tonne. If this tractor is operated on a level road having a rolling resistance of 40 kg per tonne, then the drawbar pull of the tractor will________________?

MCQs 7: Which of the following excavators is most suitable for digging under water?

MCQs 8: For which of the following materials, the output of power shovels for a fixed shovel size will be maximum_______________?

MCQs 9: Consider the following statements for a power shovel?
(i) Output can be increased by reducing the angle of swing for a given depth of cut
(ii) For a given angle of swing, output will be maximum at optimum depth of cut
(iii) Output can be increased by keeping the depth of cut less than optimum depth
(iv) Output can be increased by increasing the size of shovel
select the correct statements?

MCQs 10: If the output of a dragline for 90° angle of swing at optimum depth of cut is X, then the output for 120° angle of swing at 120 % of optimum depth of cut will be_________________?