MCQs 1: What does a load duration curve represent?

MCQs 2: What is the shape of the load duration curve?

MCQs 3: Maximum and Minimum loads on the load duration curve is represented on which respective side?

MCQs 4: What does the chronological load curve indicate?

MCQs 5: What is a load factor?

MCQs 6: What is the load factor of a power plant?

MCQs 7: The load factor plays a key role in determining which among the following?

MCQs 8: An industrial consumer has a load pattern of 2000 kW 0.8 lag for 12 hours and 1000 kW unity power factor for 12 hours. What is the load factor?

MCQs 9: What is the plant capacity factor?

MCQs 10: Capacity factor will be very low when the power plant _________________.

MCQs 11: A thermal generating station has a installed capacity of 15 MW and supplies a daily load of 10 Mw for 12 hours and 5 MW for remaining 12 hours. The plant capacity factor for this station is _______.

MCQs 12: In a power station, the cost of generation of power reduces most effectively when _______________.

MCQs 13: What is the diversity factor?

MCQs 14: What is operating value of diversity factor?

MCQs 15: Diversity factor is helpful in computing which of the following factors?

MCQs 16: A large diversity factor of the load in a power system

MCQs 17: What is the result of the product of diversity factor and maximum demand?

MCQs 18: Maximum demand on the power system is

MCQs 19: What is demand factor?

MCQs 20: What is the value of demand factor?